Modal title
Modal body text goes here.
Log In
Upgrade
This Waterway Guide printed content is only available online to our premium subscribers. Please upgrade to view this content.
Lady's Island (Woods Memorial) Bridge
- Mile Marker: 536.0
- Lat / Lon: N 32° 25.650' / W 080° 40.150'
- Bridge Type: Swing
- Vertical Clearance (Closed): 30.00 ft.
- Horizontal Clearance: 90.00 ft.
- Schedule:
Bridge opens on signal, except from 6:00 a.m. to 9:30 a.m. and 3:30 p.m. to 7:00 p.m., Mon. through Fri. (except federal holidays), when the draw need not open to navigation. From 9:30 a.m. to 3:30 p.m., the draw need open only on the bottom of the hour. This is the schedule for June through September. The schedule varies by season so it is best to call ahead (843-521-2111). Vessels that can clear the 30 foot published bridge height can pass through at any time.
Editor's Note: This was provided by the bridge tender and may vary from what is published in the Local Notice to Mariners. Bridge schedules are subject to temporary change due to repairs, maintenance, events, etc. Check nav alert for for potential schedule changes: https://www.waterwayguide.com/explorer?latitude=32.42669006238832&longitude=-80.67235445736722&zoom=14.284093893760348&mode=navAlert
- VHF Channel: 9
- Phone: 843-521-2111
- Comments:
Note: Referred to as Ladies Island on NOAA Chart.
DISCLAIMER: Bridge heights and clearances are published from sources and records provided by various state and federal entities. Waterway Guide Media does not warrant the information as accurate. Water depth, placement of on-location signage and other variables may impact published horizontal and vertical clearances. Exercise caution when transiting.
10 Boater Comments
These are observations from the boating community. Waterway Guide information is verified regularly and all efforts will be made to validate any new updates submitted here. Thank you for taking the time to share comments about your experience.
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
Current Review Policies
Waterway Guide reserves the option of editing reviews and comments for grammar, clarity and the removal of defamatory or potentially slanderous language. When appropriate, reviews are forwarded to businesses for response prior to being made public. We will make every effort to be objective and impartial when posting reviews, but do not publicize details of disputes between parties.
- Comments are reviewed and/or verified by Waterway Guide staff and do not post immediately. Please use a valid email address so that we can contact you if we need clarification (email address will not be published).
- Name will be published. Anonymous comments may not be posted.
- Comments will be shared with the reviewed marina to offer them an opportunity to respond. If they choose to do so, the marina’s comments may also be posted in response to the original comment.
- Comments containing foul or obscene language will be rejected or returned for resubmission.
- Comments containing personal attacks will be rejected or returned for resubmission.
- Off-topic content will be rejected.
- Comments must describe commenter's personal experience – “hearsay” reports will be rejected.
- Comments must be understandable and clear enough to inform other boaters.
- URL links are allowed only if they inform the content – no “advertising” your business or blog.
-
Comment by: , Sea Por Favor, on Jul 10, 2025
Vessel Type: Sail
LOA: 42'
Draft: 5.0'July 10, 2025. Waiting to go through Lady's Island Bridge. The published information says between 9:30 AM and 3:30 PM, bridge opens on the hour. Not true, opens on the half hour. In the comments there is a post from the bridge captain that says this. Why hasn't the WG and others updated this information..
-
WG Editor Comment:
We vet all the information that comes in and have been waiting for the Local Notice to Mariners to publish an update us on this, which they have yet to do. The bridge tender confirmed that between 9:30 AM and 3:30 PM, the bridge opens on the bottom of the hour (i.e., 9:30, 10:30, 11:30, etc.).
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: John on Apr 9, 2025
Vessel Type: Power
Draft: 0.0'I'm the bridge captain for the Lady's Island Bridge. Per the USGS, our current schedule is 6am - 9:30am, closed to vessels 9:30am - 3:30pm, once every hour at the bottom of the hour 3:30pm - 7pm, closed to vessels 7pm - 6am, open upon request
-
WG Editor Comment:
The schedule in the bridge listing is from the CFR's.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: Astrid Leust on Mar 19, 2025
Vessel Type: Sail
LOA: 40'
Draft: 5.0'On March 19 2025 we expected hourly opening on the hour, but found it only opens on the half hour. Info in waterway guide is confusing as to when we really should have expected it to open.
-
WG Editor Comment:
There is a nav alert posted in Eplorer.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: Scott Lapointe, Heliopause, on Mar 19, 2025
Vessel Type: Power
LOA: 56'
Draft: 5.0'This bridge entrance has 2 sides to choose. Take North side of bridge as south side of bridge has collision damage narrowing passage as of March 19, 2025
-
WG Editor Comment:
The southern channel is closed to navigation. See nav alert posted.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: David Charlton on Dec 31, 2024
Vessel Type: Sail
LOA: 38'
Draft: 4.0'Tried to go through at 2pm today but was told openings are on the half hour only.
-
WG Editor Comment:
This information is included in the posted bridge schedule.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: Benjamin Resch on Dec 13, 2024
Vessel Type: Sail
LOA: 47'
Draft: 5.5'Learned this morning that winter hours are in effect; bridge master told us first opening is at 9:30, not 9:00am (as published), so spent 30 mins circling around.
-
WG Editor Comment:
The schedule in this listing is from the CFR's. Nothing mentioned about 0930 openings.
View location on the Waterway Guide Explorer
-
WG Editor Comment:
-
Comment by: Janet Gannon on Nov 23, 2023
Vessel Type: Sail
LOA: 37'
Draft: 5.5'Although the bridge is on demand on holidays, there is a Turkey Trot on Thanksgiving and the bridge doesn't open until 945.
View location on the Waterway Guide Explorer
-
Comment by: Gary Johnson on Jun 2, 2023
Vessel Type: Sail
LOA: 48'
Draft: 5.5'Maintenance issues evidently plague this bridge. Waited almost 2 hrs for a maintenance crew to show up and get it open. The bridge tender was professional and courteous, but it was a frustrating delay in a long day.
View location on the Waterway Guide Explorer
-
Comment by: Gary Johnson on Jun 1, 2023
Vessel Type: Sail
LOA: 48'
Draft: 5.5'Maintenance issues evidently plague this bridge. Waited almost 2 hrs for a maintenance crew to show up and get it open. The bridge tender was professional and courteous, but it was a frustrating delay in a long day.
View location on the Waterway Guide Explorer
-
Comment by: Lisa Kennedy on Apr 29, 2019
Vessel Type: Sail
LOA: 49'
Draft: 6.0'Friendliest bridge tender we have encountered in a long time. Great experience, put a smile on our face. Thank you
View location on the Waterway Guide Explorer